Original Span   Second Span   Pictorial Gallery
CONSTRUCTION STATISTICS & COMPARISONS

ITEM

ORIGINAL SPAN

SECOND SPAN

Type of Bridge

Cantilever Truss

Continuous Tied Arch

Total length of bridge (excluding plazas)

6,178'  (1,883m)

6,109' (1,862m)

Number of Spans

72

39

Main Span Length

871' (266m)

922' (281m)

Truss/Arch Span Length

1,576' (480m)

1,480' (451m)

Deck Width

38' (12m)

51' (15.6m)

Lanes/Width

3 @ 10' 8" each

3 @ 12' 0" each

Total Weight of Main Span

28,340 tons

20,084 tons

Total Weight of American Approach

9,940 tons

30,591 tons

Total Weight of Canadian Approach

11,050 tons

33,353 tons

Total Weight of Steel & Concrete

86,905 tons

84,028 tons

Rivets

2,228,000 (500 tons)

None

Bolts

None

350,000

Steel Foundation Piling

None

31 miles (50,302m)

Clearance Above River

152'

155'

Top of Steel Above River

210'

233'

Main Pier Construction

Each main pier contains 10,000 tons of concrete & reinforcing steel resting on rock

Each main pier sits on 144 H-piling driven 105' to bedrock

Construction Commencement

June 24, 1937

June 15, 1995

Main Span Steel Joined

May 24, 1938

November 6, 1996

Open to Traffic

October 10, 1938

July 22, 1997

Cost of Construction

$3,250,000. U.S. funds

$79,269,755. U.S. funds

Total Cost

(Construction, Ferries, Engineering,Right of Way, Environmental Activities, etc.)

$3,900,000. U.S. funds

$107,488,651. U.S. funds

Tolls

$0.60/car & driver
$0.10/passenger/pedestrian

$1.25/car
$1.50/axle/truck